A mission-critical, hyperscale data centre facility in Sydney's western corridor, delivered alongside the architectural and base-build teams.
Apex provided engineering design and coordination for a hyperscale data centre development at Eastern Creek, supporting the architectural and base-build teams from concept through to detailed design.
The development spanned a large site with extensive roof and hardstand areas, demanding close coordination across the project team to meet a demanding performance brief.
Uptime, redundancy and cooling performance drove the engineering approach, with the design coordinated to support a facility built for continuous operation.