An industrial warehouse development at Armidale, delivered under the Complying Development Certificate pathway.
Apex delivered the engineering design for a warehouse development at 25 Cameron Drive, prepared to support the Complying Development Certificate (CDC) application.
The design addressed site grading, earthworks, vehicle access, pavement design and utility coordination, together with a coordinated drainage strategy managing runoff without impacting adjoining properties.
The documentation was coordinated with the architectural layout and certifier to provide a practical, construction-ready package.